MOQ: | 1Unit |
Price: | Negotiable |
Standard Packaging: | N/A |
Delivery Period: | 25-35Days After Downpayment |
Payment Method: | L/C, D/P, T/T, D/A |
Supply Capacity: | 10Units/Month |
Zoomlion ZE60E-10 Excavator 2020 | |||
Specification | Main performance | ||
Total weight | 6050 kg | Travelling speed(Low/High) | 4.2/2.3(km/h) |
Bucket capacity | 0.23 M3 | Max digging deptth | 3830mm |
Engine | related speed | 4.5Km/h | |
ModeL | XSNVA | Swing speed | 10.8r/min |
Moving type | Clawer Excavtor | Emission | Chian stage3 |
Rated power | 36.2Kw/2100kw/rpm | Displacement | 3.059L |
Max Torque/sped | 255/1800N.m | Ma.bucket digging force | 51.2KN |
MOQ: | 1Unit |
Price: | Negotiable |
Standard Packaging: | N/A |
Delivery Period: | 25-35Days After Downpayment |
Payment Method: | L/C, D/P, T/T, D/A |
Supply Capacity: | 10Units/Month |
Zoomlion ZE60E-10 Excavator 2020 | |||
Specification | Main performance | ||
Total weight | 6050 kg | Travelling speed(Low/High) | 4.2/2.3(km/h) |
Bucket capacity | 0.23 M3 | Max digging deptth | 3830mm |
Engine | related speed | 4.5Km/h | |
ModeL | XSNVA | Swing speed | 10.8r/min |
Moving type | Clawer Excavtor | Emission | Chian stage3 |
Rated power | 36.2Kw/2100kw/rpm | Displacement | 3.059L |
Max Torque/sped | 255/1800N.m | Ma.bucket digging force | 51.2KN |